Skip to content
Themis Metrics FR
Methodologies

Local authority methodology

Assessing separately what a large local authority faces and what it imposes, rating only the management that is genuinely its own.

Version 2.2, edition of 1 November 2026.

Themis Metrics assesses large urban local authorities on two distinct questions: what the local authority faces as a result of environmental, social and governance pressures, and what it imposes on residents and the environment. The two answers are measured separately, without compensation.

Who it applies to

The methodology applies to large urban areas in sub-Saharan Africa. A local authority is eligible if it meets at least one of the following three conditions:

  • having at least 200,000 inhabitants (latest census or latest official projection);
  • having the legal status of a city, district or metropolitan authority;
  • having at least 100,000 inhabitants and belonging to an urban area of at least one million inhabitants.

National public institutions and semi-public companies fall under the corporate methodology.

Founding principles

  • Double materiality. Each issue is examined from two angles: the local authority’s vulnerability to external pressures, and the damage it causes.
  • Residual logic. Scores measure what remains once the management actually put in place and proven has been taken into account.
  • A fixed universe, calibrated by country. The same ten issues apply to all local authorities; the starting parameters are set by country, according to the powers the law gives to cities.
  • Potential and performance kept separate. What a reference local authority could control is distinguished from what the rated local authority achieves.
  • Prudence and traceability. Where a signal is ambiguous, the most prudent interpretation is adopted; each score is justified in writing.
  • Non-compensation. Exemplary management of local finances does not mask a failure on waste.
  • Independence of the two scores. No composite score is published.

Two scores: residual ESG risk and impact

  • Residual ESG risk (Rr) measures what the local authority faces: floods, coastal erosion, loss of revenue and litigation that threaten its services and budget. It is intended first and foremost for lenders, funders and supervisory authorities.
  • Residual ESG impact (Ir) measures what the local authority imposes: an uncontrolled landfill, a housing development authorised in a flood zone, households deprived of a service the law requires it to provide.

The methodology does not assess any positive contribution: good management reduces the burden of risk and impact, but never produces a “credit”.

How risk and impact ratings are calculated

The two ratings follow the same path, carried out separately and issue by issue:

  1. Exposure. It starts from a level set for the country, because the large urban areas of a country exercise the mandate set by the same decentralisation law; it is then adjusted to the territory, size and specific features of the local authority.
  2. What can be controlled. A distinction is made between what a reference local authority could control with the powers and resources the law gives it, and the structural core, which would remain even with optimal management.
  3. Quality of management. Two separate questionnaires, one for risk and one for impact, measure proven arrangements. Absence of evidence counts as absence of arrangements.
  4. Residual score. It results from an addition, not a subtraction.

Residual score = structural core + controllable share that the local authority has not demonstrably neutralised

For impact, only the share genuinely attributable to the local authority is retained. Filters (controversies and, for impact, significant harm to the environment and minimum social safeguards) reduce the management credit where a breach is established. The final risk rating and the final impact rating are each the unweighted sum of the scores of the ten issues. A rating is binding only if at least 60% of the analysis is based on admissible data.

What is attributable to the local authority

An impact is attributed to the local authority only if three conditions are met:

  • the power has been legally transferred to it;
  • it exercises effective control over it;
  • resources existed or could have been mobilised.

Damage it could not have avoided, for lack of the necessary resources, is recorded in the report without weighing on the rating. Results that do not fall within its powers are never rated as its management.

Rating scale

Risk and impact are read on the same six-level scale, applied to the total score of the ten issues. The rating is always accompanied by the score and its average per issue (total divided by ten), for example: “Rr = 27.0, i.e. 2.70 per issue — Medium”.

Rating scale — the lower the score, the lower the residual risk or impact, and the better.
RatingScoreMeaning
Negligible from 0 to under 10 No significant risk or impact for the mandate exercised.
Low from 10 to under 20 Low residual risks or externalities.
Medium from 20 to under 30 Moderate risks or externalities, calling for proportionate vigilance.
High from 30 to under 40 Continuity of essential services or budget sustainability under threat; significant externalities.
Severe from 40 to under 50 Ability to exercise the mandate called into question; major externalities.
Extreme 50 and above Exercise of the mandate seriously compromised; exceptional externalities. Mandatory review by the Scientific Committee.

The boundary between the control zone and the vulnerability zone is at a score of 30.

Governance and process

  • Each file is prepared by a senior analyst and decided by a three-member rating committee.
  • The agency does not rate and advise the same entity at the same time, and its fees do not depend on the result.
  • Before publication, the local authority receives the draft report, may submit documents and has a right of reply; an appeal procedure is provided for.
  • Every publication presents the two scores with the same prominence, together with the data coverage rate.

Limitations and cautions

The rating is an independent ESG opinion and a decision-making tool. It is neither a credit rating, nor investment advice, nor legal advice, nor an audit. Local data is often incomplete: gaps are flagged in each report. Comparisons between countries call for caution, as the state of decentralisation is part of the risk score.

Receive the full methodology

This page presents the summary. The full framework is sent free of charge, by e-mail, to anyone who requests it from the address of their company or institution. It is currently available in French.

Fields marked with an asterisk (*) are required.

Personal mailboxes (Gmail, Yahoo, AOL, Hotmail, Outlook…) are not accepted. Does your organisation not have its own address? Write to us.

Would your local authority like to be rated?

Our team will present the approach, the documents required and the timetable.